All good things must come to an end. The Sacred Heart Church School building has seen better days and with the Church wanting to put up a new facility- the old one had to come down.
Our crew was ready for the challenge. After as much of the materials as possible were salved from the interior of the building- we started bringing down the exterior and hauling it off site. Our crane is pictured here lifting out the rafter system.